Preliminary Project

Code: PREPRO

Rate this product

Invia

H2planet's staff of technicians and engineers will be available for the analysis and study of the system based on customer needs, to provide completely finished, highly technological and reliable system


Preliminary project 
In this phase, the staff designs: H2 production, storage and supply and use system and all parts of the plant in compliance with current and safety regulations and the complete sizing to follow the laying, installation and testing phase, providing for the timing of the various phases for starting.
This final phase includes face-to-face meetings and inspections, the project and the proforma invoice are final.
The complete design phase, following all the steps listed above, takes place for projects of an economic relevance, with hypotheses of costs not less than € 500,000.

Similar products

Belong to the same category